Microware Multimedia Private Limited EVM02 - Wireless
Key Features
- Movement detection technology: Optical
- Connectivity technology: Wireless
- Product dimensions: 11.43 x 6.6 x 6.6 cm
- Weight: 100g
- Batteries included: No
- Special features: Wireless
Specifications
Product Details
Reviews
Join our newsletter
Be the first to know about new arrivals, sales, and exclusive picks
Sign in to unlock newsletter access and stay in the loop
