Upgrade your cooling experience with the Geepas GACS3025CUE 2.5 Ton Split Type Air Conditioner, engineered for powerful and efficient cooling. With a 30,000 BTU capacity, this unit is perfect for cooling large rooms, ensuring optimal comfort even in high-temperature environments.
Designed with energy efficiency in mind, it features an Eco Energy-Saving mode to reduce electricity consumption while maintaining superior performance. The auto restart function allows the AC to resume operation automatically after power failures, providing uninterrupted comfort.
The LED display enhances usability with a clear and stylish interface, while the strong airflow system ensures even cooling throughout the room. The air conditioner’s elegant appearance blends seamlessly with modern home or office décor, making it both a functional and aesthetic addition to any space.
Whether you're looking for powerful cooling, energy efficiency, or a sleek design, the Geepas GACS3025CUE delivers all the features you need for a comfortable and refreshing environment.
Terms & Conditions for AC Installation – UAE Covered under Standard Installation: • Drilling of holes into a brick wall for routing pipes. • Fixing of hole sleeve and cap. • Installation and connection of indoor and outdoor units using the standard installation kit provided with the product. Not Covered under Standard Installation (Additional charges apply): • Provision or installation of outdoor unit stand. • Extra copper piping or wiring beyond the standard kit. • Extension of drain pipes. • Electrical wiring extension from the meter to the installation location. • Vinyl tape or other additional consumables. • Dismantling or relocation of existing air conditioning units. • Sealing of holes with white cement or similar materials. • Provision or installation of voltage stabilizer. • Plumbing or masonry work. • Power socket/MCB installation or other electrical services. • Carpentry work. • Core cutting, fabrication, or any electrical customization. • Installation work beyond a height of 3 meters. • Removal and disposal of existing unit and packaging materials. • Any change in installation location after service initiation. Customer Preparations Prior to Installation: • Obtain permission for drilling and product movement within the premises. • Ensure no water pipes obstruct the wall where drilling is required. • Confirm availability of service lift or wide staircase for moving the unit. • Ensure existing installations are removed if a new unit is to be installed at the same location.